Fraud Blocker

Kitchen Remodeling In Merrill, WI

Whoever's cooking shouldn't have to leave the room to be part of the evening.

Modern kitchen remodeling with two-tone cabinets, quartz countertops, gas range, and custom wood range hood

Kitchen Remodeling in Merrill, WI That Opens the Room Back Up

Older Merrill homes were laid out with the kitchen as a service room. It went at the back, behind a door, because cooking was work and work happened out of sight. That arrangement makes very little sense in a house where the kitchen is now the room everyone gravitates to. 

There’s a scheduling wrinkle here too. Merrill runs on shift work, and in a house where people eat at 4 p.m., 7 p.m., and again after a late shift, the kitchen needs to handle three separate meals without three separate messes. 

Good storage, a second prep zone, and an island that doubles as a place to eat all earn their keep. 

We’re Remodeling Journey, a design-build remodeler based in Weston, twenty minutes down Highway 51. We draw it, price it, permit it, and build it with our own crew, and we’ve been a Greater Wausau Chamber of Commerce member since early 2026.

Kitchen remodel featuring custom wood cabinetry, quartz island, stainless appliances, and tile backsplash

Why Merrill Homeowners Trust Us With Their Kitchen

Kitchens From Our Portfolio

Finished kitchens from recent projects, shot after the last drawer pull went on.

3D bathroom design

5-year workmanship warranty

Trusted by 40+ families

What Clients Say About Their New Kitchen

Almost everyone tells us the same surprising thing first, which is how much louder and busier the room got once the wall came out.

p

Pao V

Rated 5 out of 5

Working with Justin and his team has been an amazing experience. I’m in the middle of facelifting my old kitchen. I started off by repainting my cabinets; however the missing touch to a completed kitchen is my outdated countertop and backsplash. 

I was afraid that Justin might decline the project that I had to offer because my project was too minimal. Justin surprised me by accepting my project, provided me with ideas, and created a 3D rendering of my finished kitchen.

Even though my project was small and only lasted 4 days from demolition to finished product, Justin treated it as if it was a large and important project. He provided me with proposals, 3D rendering, and a schedule that they all met. 

He kept me updated on a daily basis regarding the progression of the project. Working with Justin has been a positive experience and I am sure that we’ll be calling him for future projects.

e

Elizabeth Reisner

Rated 5 out of 5

I was referred to Justin and his company Remodeling Journey by a mutual friend who knew I had been wanting to update my kitchen for a long time. I was new to the process of home renovations, and was nervous about finding the right company who I could rely on to complete the project. 

I am so glad I reached out to Justin, because now I have my dream kitchen! My kitchen before was dark and dated, but now it’s beautiful, bright, and exactly to my taste! The entire process was extremely well scheduled, and my kitchen was completed in less than a month. 

Everyone on Justin’s team was extremely professional and respectful, and they did amazing work! I love my new kitchen, and I am excited to work with Justin and Remodeling Journey on future renovation projects around my home!

What Should You Budget?

Our kitchens have run anywhere from $30,000 to $97,000, and the biggest lever by far is cabinetry. Stock, semi-custom, and fully custom cabinets can separate two otherwise identical kitchens by tens of thousands of dollars.
Tier Roughly What It Typically Buys
Base $42,000 New countertops, quality lighting, new sink, new flooring, updated hardware
Mid-range $71,000 Semi-custom cabinetry, a real island, a reworked layout, better surfaces
Custom $97,000 and up Custom cabinets, premium counters, moved walls, details drawn for your house

Three finished projects, for a sense of how it plays out in practice: $53,556 on 280 square feet, $81,231 on 325 square feet, and $108,404 on 270 square feet. Note that the most expensive kitchen there is also the smallest. Finish level drives the number more than floor area does. 

If a full remodel is more than you need right now, our kitchen refresh service covers lighter-scope updates.

Three Steps, Start to Finish

The owners of Remodeling Journey

1

Layout First

Before we talk finishes, we settle where things go. Sink, range, refrigerator, seating, and which walls can move. You’ll see it in 3D and walk through it on screen.
bathroom building process

2

Selections Locked

Cabinetry, counters, tile, fixtures, and appliances all get chosen and ordered together. Demolition doesn’t start until every one of them is sitting in our warehouse.
Hardwood flooring in an open space kitchen with gray cabinets and overhang lights

3

One Crew In and Out

The same team does the whole build, we schedule the inspections, and you get five years of workmanship coverage plus an annual visit when it’s done.

What Sets Remodeling Journey Apart

Nothing is ordered off a sketch

You get a professional 3D design, so the layout is settled while changing it still costs nothing.

Your kitchen doesn't sit gutted

Materials arrive first. That single policy is why our timelines hold.

Five-year workmanship warranty

on material and craftsmanship defects, with an on-site check-in every year of it.

One company from design through inspection

No handoff to a builder who wasn't in the design meeting.

A reply inside one business day

during the project as well as before it.

Modern kitchen renovation with white cabinets, black countertops, stainless steel appliances, and center island

Kitchen Remodeling Questions From Merrill

Yes. We contain the work area, protect floors along the path in and out, and keep the rest of your house usable. Most families set up a temporary kitchen in a dining room or basement for the duration.
Countertop and backsplash upgrades run about a week. A full custom kitchen can reach 12 weeks, and custom cabinets alone carry a 2 to 3.5 month lead time, which is exactly why we order before we demo.
Often, yes. If it’s load-bearing we’ll show you what carrying the load costs, usually a beam and posts, and you’ll see it in the design and the budget before you decide.
If the project touches plumbing, electrical, or structure, yes. We pull it and schedule the inspections as part of the job.
We plan transitions deliberately so the new kitchen connects to the existing floors and trim instead of stopping at a hard edge. Where matching isn’t possible, we’ll say so early.
Yes. Running water, drain, or gas to an island means opening the floor, so it’s a decision we settle during design rather than mid-build.

Take the Wall Out and See What Happens

Justin, the owner of Remodeling Journey
Justin Pagel

A kitchen that connects to the rest of the house changes how the whole evening goes. Have a look at our kitchen remodeling projects, then let’s measure your room and see what opens up. Call us at (715) 551-7328 or contact us here.

Merrill sits at the meeting of the Prairie and Wisconsin Rivers as the seat of Lincoln County, and it’s a genuine working town, with metals, window, door, packaging, and footwear manufacturing anchoring the local economy. The city keeps a public list of Merrill’s historical sites, which is a decent reflection of how much original housing stock is still standing and still lived in. Those homes are the reason kitchen work here is usually as much about layout as it is about finishes. Anything structural goes through the City of Merrill building permit process, and that’s on us to handle.